wdt_ID | Company | Product | Company Website | Small Patch | Large Patch | Lightweight | Joint Facing | <1/2-IN DEPTH | >1/2-IN DEPTH | Horizontal | Vertical | 50-LB Bag of Powder | Pail Ready to Use | Additive #1 | Additive #2 | Additive #3 | Primer | Cost Range ($/CU FT) | Yield Neat (CU FT) | Yield Extended (CU FT) | Min Install Temp (◦F) | Max Install Temp(◦F) | Open to Traffice After Placement (HOURS/MINUTES) | Placement of Sealer or Overlay (HOURS/DAYS) | Compressive Strength at 1-2 HOURS | Compressive Strength at 24 HOURS | Bond Strength (PSI) | Shrinkage (%) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | D.S. Brown Company | Delpatch Elastomeric Concrete | https://www.dsbrown.com/pavements/delpatch/ | Small Patch | Joint Facing | >1/2 - Inch depth | Horizontal | Additive #1 | Additive #2 | Additive #3 | Primer | $150/CF to $190/CF | 3.7 c/f | 45 | 95 | 2 hours | 2 hours | 100 PSI | 2,400 PSI | 500 PSI | Linear Shrinkage @ 7 days -0.015% | |||||||
2 | D.S. Brown Company | D.S. Brown Company | https://www.dsbrown.com/pavements/delpatch/ | Small Patch | Joint Facing | >1/2 - Inch depth | Horizontal | 50-LB Bag of powder | Additive #1 | Additive #2 | Primer | $110/CF - $125/CF | 1.0 CF | 40 degrees | 95 degrees | 4 hours | 4 hours | 1,000 PSI | 4,500 PSI | 2,500 min | Negligable | |||||||
3 | E-Chem, LLC | EP-PATCH | http://e-chem.net/ep-patch/ | Small Patch | Large Patch | Joint Facing | <1/2 - Inch depth | >1/2 - Inch depth | Horizontal | Pail ready to use | Additive #1 | Additive #2 | Additive #3 | 90-150 | 0.5 CU Ft | 0.75 CU Ft | 50°F and rising | >95°F requires special considerations | 3.5 hours @ 75°F | Immediate | 1,000 psi | 5,000 psi | 2,000-2,400 psi | 0% | ||||
4 | E-Chem, LLC | EP-PATCH LPL | http://e-chem.net/ep-patch-lpl/ | Small Patch | Large Patch | Joint Facing | <1/2 - Inch depth | >1/2 - Inch depth | Horizontal | Pail ready to use | Additive #1 | Additive #2 | Additive #3 | 90-150 | 0.5 CU Ft | 0.75 CU Ft | 60°F | >95°F requires special considerations | 5 hours @ 75°F | Immediate | 1,000 psi | 5,000 psi | 2,000-2,400 psi | 0% | ||||
5 | E-Chem, LLC | EPC-OVERLAY | http://e-chem.net/epc-overlay/ | Small Patch | Large Patch | Joint Facing | >1/2 - Inch depth | Horizontal | Pail ready to use | Additive #1 | Additive #2 | Additive #3 | 90-150 | 0.67 CU Ft | NA | 50°F and rising | >95°F requires special considerations | <4 hours @ 75°F | Immediate | 1,000 psi | 5,000 psi | 500-700 psi (CT551/CP-L4302) | 0% | |||||
6 | International Paint | Intercrete 4802 (bulked out with pea gravel) | https://www.international-pc.com/line/intercrete | Small Patch | Large Patch | >1/2 - Inch depth | Horizontal | 50-LB Bag of powder | $216/cu ft per bag | 3.5 gal/bag | 0.46 cu ft/bag | 41 F | 95 F | 2 hours | 2 hours | 2900 psi | 5801 psi | 346 | 0-5% | |||||||||
7 | Kwik Bond Polymers | Polyester Polymer Concrete (PPC) | https://www.kwikbondpolymers.com/wp-content/uploads/2018/04/KBP_PDS_PPC1121.pdf | Small Patch | Large Patch | Joint Facing | <1/2 - Inch depth | >1/2 - Inch depth | Horizontal | 50-LB Bag of powder | Pail ready to use | Additive #1 | Additive #2 | Additive #3 | Primer | 60-75 | Varies with packaging | N/A | 0 | 100 | 2 hours at any allowable temperature | 2 hours | 4,000 psi (at any allowable temperature) | 6,500 psi | Substrate tensile strength | 50 microstrain (ASTM C157) | ||
8 | Phoscrete | Phoscrete HC | https://www.phoscrete.com/ | Small Patch | Large Patch | Joint Facing | >1/2 - Inch depth | Horizontal | 50-LB Bag of powder | Additive #2 | 100 to 180 $/CU Ft | 0.47 | Pre-extended | ‐5°F (when used with Fast-Set Admixture) | 30 min. to 1 hour | 1 hour | 4,110 psi | 5,730 psi | 1,830 - 2,750 psi | 0.028 | ||||||||
21 | Watson Bowman Acme | Wabo®Crete II | https://www.wbacorp.com/products/wabo-crete-ii | Small Patch | Large Patch | Joint Facing | >1/2 - Inch depth | Horizontal | Pail ready to use | Additive #1 | Additive #2 | Primer | $120 - $150 | 0.6CF | N/A | 40°F | 110+°F | 1-1.5 hours @ 70°F | 1-2 hours | 1000 psi | 2200 psi min | 400 psi min | N/A | |||||
22 | Watson Bowman Acme | Wabo®ElastoPatch | https://www.wbacorp.com/files/technical-datasheets/WaboElastoPatch_1216_DataSheet.pdf | Small Patch | Large Patch | Joint Facing | >1/2 - Inch depth | Horizontal | Pail ready to use | Additive #1 | Additive #2 | Primer | $140 - $170 | 0.5 CF | N/A | 40°F | 110+°F | 1-1.5 hours @ 70°F | 2 hours | 800 psi | 1400 psi | 250 psi min | N/A |